  • Rural sites where ground conditions favour the use of a septic tank with discharge to sub-surface irrigation

Features

  • Robust, easy to install septic tank from a manufacturer with over 20 years experience in the waste water market

  • A range of sizes from 2800 - 45000 litres

  • Standard 1.0 metre invert and Heavy Duty 1.5 metre invert

  • Adjustable access shaft for ease of installation

  • 110mm upvc swivelling inlet and outlet sockets

  • Safety frame and cover enabling tank ventilation

  • Annual desludging intervals

  • Full installation details supplied with each tank

  • Available nation-wide via Builders Merchants for direct to site delivery

  • Third party testing and accreditation by BBA Certification No 90/2532

  • Titan Septic Tanks comply with BS6297 1983

  • All Titan products are manufactured under the quality procedures of BS EN ISO9002

side.jpg (7306 bytes)

 

 

 

 

Design

Titan Agrément Certified Septic Tanks are designed to separate and settle the solids present in raw sewage leaving the resultant liquor to be absorbed in the soil.

A genuine 3 stage settlement tank minimises the risk of solids carry-over and ensures a long term maintenance free sub-system. The tank should be emptied once a year.

Model Selection

The size of development defines the capacity of the tank required.

Refer to Titan for capacities greater than 9000 litres

The grade of the tank required depends upon the invert level only.

sttableside.jpg (7514 bytes)

Siting

The following should be considered when siting the tank and dispersal system:

  • The site should preferably be a minimum of 15 metres from the nearest habitable dwelling

  • The dispersal system should be a minimum of 10 metres from the nearest water course and at least 1 metre above the local water table

  • Emptying vehicles should have access to within 35 metres of the tank

  • A site which is subject to traffic loading should be avoided.

< BACK

titanmain.jpg (6449 bytes)

AGRÉMENT CERTIFIED
Septic Tanks

stmain.jpg (15551 bytes)

Products for the next generation

 

Soil Porosity

To establish the overall length of a drain run required a soil porosity test may be necessary. The following procedure should be adopted.

  • Excavate a hole 300mm square by 250mm deep below the proposed invert level of the land drain

  • Fill hole with water to a depth of 250mm and allow to drain away overnight

  • Refill to a depth of 250mm and note the time taken to drain away completely

  • Repeat this exercise two more times and calculate the average time

  • By reference to the table the length of drain run required for various capacity tanks may be established.

stpicl.jpg (20621 bytes)A looped system of rigid perforated or butted land drains as shown should be laid in trenches lined with gravel. Coiled plastic drainage pipe is not recommended.

To ensure even distribution it is important for the land drains to have a uniform gradient of no more than 1 in 200

Pumped Systems

In circumstances where it is necessary to lift the effluent to a higher level for dispersal, we can provide a standard pump package for fitting after one of our septic tanks. This package comes complete with glass fibre pumpwell, fully submersible pump, automatic float control and all necessary internal fittings.

sttabler.jpg (15963 bytes)

Installation

In all cases the tank should be seated on a firm concrete base. For a dry well drained site, backfill should be 10mm rounded pea single or similar. If the site is wet with poorly draining soil then the tank should be backfilled with concrete, filling with water at the same time to prevent flotation.

Effluent Dispersal

Where the water table and the nature of the soil allow satisfactory absorption, dispersal should be by means of a sub-surface irrigation system.

Treatment Plants

Where discharge is to a ditch or water course (subject to Environment Agency approval) further treatment is essential. Details of the comprehensive range of Titan Biotec sewage treatment plant are available on request.